ÉTUDES DE CAS
Baltimore Museum Of Art
The Baltimore Museum of Art was in need of several temporary buildings to create the foundation for an upcoming exhibit “Mickalene Thomas: A Moment’s Pleasure.
Bi-Coastal Covid-19 Testing and Vaccination Sites
Amidst the ongoing global pandemic, a healthcare provider found itself in need of temporary COVID-19 testing sites to help keep patients and staff safe. With offices across the U.S., they needed modern, multi-functional workspace on both coasts that could meet their changing with their needs.
Centrale nucléaire de Bruce
WillScot a livré des bureaux mobiles modulaires conformes aux réglementations canadiennes pour l’équipe technique et l’équipement de surveillance nucléaire de la centrale nucléaire de Bruce.
Covid-19 Vaccine Development Office Space
When a local Baltimore biopharmaceutical company was tasked by Johnson & Johnson to produce a potential COVID-19 vaccine, they quickly began making plans to transition their modular office swing space into additional vaccine development workspace.
Jewish General Hospital
Having worked with WillScot in the past, the hospital turned to WillScot’s local Montreal team to deliver a modular solution in less than a month. In 30 days, the first of two new testing clinics was set up on top of a parking structure adjacent to the hospital.
Loyola University Social Distance Classroom Space
The WillScot Construction Services Division developed a plan to install 30 modular classroom buildings on Loyola's multi-purpose field adjacent to the university's student center and bookstore.
Memorial Hospital Bakersfield
Memorial Hospital, based in Bakersfield, California, was in need of additional COVID-19 testing space to help their hospital prepare for an anticipated surge in COVID-19 cases.
MileOne Auto Group
In Baltimore, two car dealerships owned by MileOne Auto Group, were in need of additional office swing space to keep business running smoothly while part of their shared parking lot, (where most of their for sale cars are displayed), underwent renovations.
University of Maryland Upper Chesapeake
The University of Maryland Upper Chesapeake Hospital had to relocate their Covid-19 testing site, so WillScot Baltimore team was able to set up 10 Flex mobile offices in under a week outside the hospital’s new Hartford County location.
University of San Diego Law School
The University of San Diego was in need of administrative swing space for their staff while their law school administrative building was under renovation.
Valor Academy Pour Garçons
La Valor Academy avait besoin de salles de classe supplémentaires pour répondre à une hausse des inscriptions. WillScot a pu configurer 17 unités modulaires pour créer huit nouvelles salles de classe et une installation de toilettes en à peine deux mois.
Base aéronavale de NAVAIR / Lakehurst
Une augmentation substantielle du personnel à Naval Air Systems Command (NAVAIR) a nécessité une solution d’espace de bureau mobile WillScot de 21 160 pi² (1 966 m²) pendant la réalisation de travaux de rénovation et d’agrandissement majeurs sur les bâtiments permanents.