CASE STUDIES

Bruce Power

Bruce Power Nuclear Generating Station

WillScot delivered a modular office trailer solution that met new Canadian regulations for Bruce Power Nuclear Generating Station’s engineering team and nuclear monitoring equipment.

Valor Academy

Valor Academy for Boys

Valor Academy needed additional classroom space to support increased enrollment, and WillScot configured 17 modular units to create eight new classrooms and a restroom facility in just two months’ time.

NAVAIR/Lakehurst Naval Airbase

NAVAIR / Lakehurst Naval Air Base

A substantial increase in personnel at Naval Air Systems Command (NAVAIR) required a 21,160 square foot mobile office space solution from WillScot while a permanent office building underwent major renovations and expansion.

Woodrow Wilson Bridge

Woodrow Wilson Bridge Project

WillScot delivered two five-section Redi-Plex modular office buildings with turnkey construction for both sides of a major bridge construction project.

BP Command Center

BP Command Centers

After the Deepwater Horizon explosion, British Petroleum (BP) needed temporary command centers across the Gulf Coast and WillScot delivered 18,000 square feet of modular office space in two weeks’ time.

Empire Stadium

Empire Stadium

During a sports stadium’s major renovations, WillScot provided 39 modular buildings for offices, locker room facilities and showers.

Leominster High School

Leominster High School

While a high school was undergoing a two-year renovation, WillScot delivered 27,000 square feet of temporary classroom space, including all utilities, connecting corridors and handicap access.

Anawalt Elementary School

Anawalt Elementary School

When a school was unexpectedly condemned at the end of the school year, WillScot was able to construct a modular school building with 26 classrooms before the next school year commenced.

Beaumont Independent School District

Beaumont Independent School District

With an increase in school funding, a local elementary school underwent renovations and construction that required 10,472 square feet of temporary classroom space, and WillScot delivered.

Kenova Elementary

Kenova Elementary School

When sinkholes caused a school to close, a new structure was necessary, but in the meantime, WillScot provided 38,000 square feet of classroom space with 52 modular classroom components.

Rite Aid

Rite Aid

After riots and looting destroyed a Baltimore Rite Aid drugstore, WillScot was able to configure a temporary store site in just eight days so the community could continue being served.

Wallenius

Wallenius Wilhemsen Logistics / MAT

When the outdated Mid-Atlantic Terminal (MAT) at the Port of Baltimore needed a replacement, WillScot delivered a custom 64’ x 65’ complex for workers using four modular office units.